GMDA Gurugram: Parshall flumes at the Behrampur and Dhanwapur STPs

Open-channel flow at five large STP units, with the data sent to GMDA, HSPCB and CPCB

The Gurugram Metropolitan Development Authority needed flow measured at the outlet and bypass channels of its Behrampur and Dhanwapur sewage treatment plants - five units of 50 to 120 MLD - and the readings sent to GMDA, HSPCB and CPCB alongside the plants' existing online analysers.

  • GMDA
  • 5 STP units
  • 50 to 120 MLD
  • 2022–23

The project

Client
Gurugram Metropolitan Development Authority
Sites
Behrampur STP, Dhanwapur STP
Units
Five, of 50 to 120 MLD
Work order
February 2022
Completed
July 2023
Data sent to
GMDA, HSPCB and CPCB

The requirement

Plants of this size discharge through open channels, not pipes, so a full-pipe electromagnetic meter was not an option. Flow had to be measured on the outlet and on the bypass channel, and reported together with the analyser readings the plants already sent.

What we did

  1. Flumes sized to each channel

    Parshall flumes in FRP, with throats from 457 mm to 1220 mm chosen for each channel's flow range.

  2. Non-contact measurement

    An ultrasonic level probe over each flume, with a transmitter converting the head to flow.

  3. Joined to the existing analysers

    Flow readings combined with the plants' existing online analyser data at the outlet and bypass channels.

  4. Data to three servers

    Readings sent to GMDA, HSPCB and CPCB.

  5. Maintenance

    Maintained through the defect liability period after completion.

Result

  • Continuous flow at the outlet and bypass channels of five STP units
  • Data reaching GMDA, HSPCB and CPCB
  • Completed in July 2023; GMDA's experience certificate records the work as satisfactory